Wednesday, December 17, 2008

Creeping Along

The bathroom progress is starting to slow to a crawl. I've essentially finished most of what I can do until the electrical issues are corrected. Last week I finished installing all of the framing and nailers that I can do for now.
I installed all the outlet boxes and fixtures that I could and wired them up as much as practically possible
I even started shoving some insulation in the closets where access will no longer be an issue. Dad came over last night and we ran all the new wiring down to the basement where the new breaker box will go.
That's 13 strands of romex ready to be run into the old fuse box and be connected to the existing wires in there. The whole bundle goes down right behind the tub.
We also re-routed a couple other wires that were in the way, allowing me to finally put the last piece of new flooring in where the chimney once was.
There's a few more little odds and ends that I will try to wrap up this weekend, but after that I will be at a standstill. I'm waiting for the power company to come pull their new cable through the conduit we buried last week and I still need my electrician to hook that up to my new breaker box. Hopefully we'll get some movement before Christmas, but we'll see. Once that's finished, we can finish ripping out the old bathroom stuff, finish framing, and get all the electrical switched over as well.